GH-5653 experimenting with query optimisation for union and optional implementated based on paper #6611
Triggered via pull request
December 29, 2025 10:47
Status
Cancelled
Total duration
9m 50s
Artifacts
–
pr-verify.yml
on: pull_request
formatting-and-quick-compile
1m 24s
copyright-check
28s
compile
3m 21s
integration-tests
8m 21s
slow-tests
2m 48s
package-assembly
3m 54s
e2e
3m 18s
Matrix: build
Annotations
10 errors
|
slow-tests
Resource not accessible by integration
|
|
slow-tests
Process completed with exit code 1.
|
|
build (25)
Resource not accessible by integration
|
|
build (25)
Process completed with exit code 1.
|
|
build (21)
The strategy configuration was canceled because "build._25" failed
|
|
build (21)
Resource not accessible by integration
|
|
build (21)
Process completed with exit code 1.
|
|
integration-tests
Canceling since a higher priority waiting request for PR verify-5654 exists
|
|
integration-tests
The operation was canceled.
|
|
PR verify
Canceling since a higher priority waiting request for PR verify-5654 exists
|