Skip to content

GH-5653 experimenting with query optimisation for union and optional implementated based on paper #6606

GH-5653 experimenting with query optimisation for union and optional implementated based on paper

GH-5653 experimenting with query optimisation for union and optional implementated based on paper #6606

Triggered via pull request December 29, 2025 03:57
Status Failure
Total duration 23m 52s
Artifacts

pr-verify.yml

on: pull_request
formatting-and-quick-compile
1m 26s
formatting-and-quick-compile
copyright-check
28s
copyright-check
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

24 errors
compile
Process completed with exit code 1.
build (25)
Resource not accessible by integration
build (25)
Process completed with exit code 1.
build (25)
Connection has been closed
build (25)
Connection has been closed
build (25)
java.lang.InterruptedException
build (25)
java.lang.InterruptedException
build (25)
java.lang.InterruptedException
build (25)
java.lang.InterruptedException
build (25)
java.lang.InterruptedException
build (25)
java.lang.InterruptedException
build (21)
The strategy configuration was canceled because "build._25" failed
build (21)
The operation was canceled.
build (21)
Process completed with exit code 1.
build (21)
Connection has been closed
build (21)
Connection has been closed
build (21)
java.lang.InterruptedException
build (21)
Connection has been closed
build (21)
Connection has been closed
build (21)
java.lang.InterruptedException
build (21)
Connection has been closed
build (21)
java.lang.InterruptedException
integration-tests
Resource not accessible by integration
integration-tests
Process completed with exit code 1.