Merge main into develop #6725
Triggered via pull request
February 18, 2026 21:42
Status
Failure
Total duration
27m 53s
Artifacts
–
pr-verify.yml
on: pull_request
formatting-and-quick-compile
2m 14s
copyright-check
35s
compile
3m 14s
integration-tests
18m 59s
slow-tests
25m 33s
package-assembly
4m 6s
e2e
3m 14s
Matrix: build
Annotations
16 errors
|
build (21)
Resource not accessible by integration
|
|
build (21)
Process completed with exit code 1.
|
|
build (21)
java.lang.InterruptedException
|
|
build (21)
java.lang.InterruptedException
|
|
build (21)
java.lang.InterruptedException
|
|
build (21)
Connection has been closed
|
|
build (21)
java.lang.InterruptedException
|
|
build (21)
Connection has been closed
|
|
build (25)
The strategy configuration was canceled because "build._21" failed
|
|
build (25)
The operation was canceled.
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|