GH-5648 new benchmark module #6572
Triggered via pull request
December 26, 2025 21:45
Status
Cancelled
Total duration
25m 30s
Artifacts
–
pr-verify.yml
on: pull_request
formatting-and-quick-compile
1m 25s
copyright-check
24s
compile
3m 37s
integration-tests
19m 21s
slow-tests
23m 35s
package-assembly
4m 21s
e2e
3m 28s
Matrix: build
Annotations
25 errors
|
build (25)
Resource not accessible by integration
|
|
build (25)
Connection is closed
|
|
build (25)
Connection is closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (11)
The strategy configuration was canceled because "build._25" failed
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
Connection has been closed
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
Connection has been closed
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
Connection has been closed
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
PR verify
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
slow-tests
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
slow-tests
The operation was canceled.
|