GH-5648 new benchmark module #6571
Triggered via pull request
December 26, 2025 21:39
Status
Cancelled
Total duration
6m 48s
Artifacts
–
pr-verify.yml
on: pull_request
formatting-and-quick-compile
2m 33s
copyright-check
24s
compile
3m 35s
integration-tests
4m 4s
slow-tests
4m 6s
package-assembly
3m 58s
e2e
3m 18s
Matrix: build
Annotations
24 errors
|
package-assembly
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
package-assembly
The operation was canceled.
|
|
build (25)
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
build (25)
The operation was canceled.
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
integration-tests
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
integration-tests
The operation was canceled.
|
|
slow-tests
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
slow-tests
The operation was canceled.
|
|
build (11)
Canceling since a higher priority waiting request for PR verify-5651 exists
|
|
build (11)
The operation was canceled.
|
|
build (11)
Connection has been closed
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
PR verify
Canceling since a higher priority waiting request for PR verify-5651 exists
|