Gh 5646 fluent shacl validator api #6560
Triggered via pull request
December 25, 2025 19:33
Status
Cancelled
Total duration
21m 16s
Artifacts
–
pr-verify.yml
on: pull_request
formatting-and-quick-compile
1m 30s
copyright-check
25s
compile
3m 29s
integration-tests
18m 51s
slow-tests
19m 15s
package-assembly
4m 15s
e2e
3m 12s
Matrix: build
Annotations
21 errors
|
build (25)
Resource not accessible by integration
|
|
build (25)
Process completed with exit code 1.
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
build (11)
The strategy configuration was canceled because "build._25" failed
|
|
build (11)
The operation was canceled.
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
integration-tests
Canceling since a higher priority waiting request for PR verify-5647 exists
|
|
integration-tests
The operation was canceled.
|
|
slow-tests
Canceling since a higher priority waiting request for PR verify-5647 exists
|
|
slow-tests
The operation was canceled.
|
|
PR verify
Canceling since a higher priority waiting request for PR verify-5647 exists
|