Gh 5646 fluent shacl validator api #6559
Triggered via pull request
December 25, 2025 19:22
Status
Cancelled
Total duration
12m 0s
Artifacts
–
pr-verify.yml
on: pull_request
formatting-and-quick-compile
1m 35s
copyright-check
32s
compile
3m 32s
integration-tests
10m 17s
slow-tests
10m 17s
package-assembly
4m 17s
e2e
3m 36s
Matrix: build
Annotations
22 errors
|
build (11)
Resource not accessible by integration
|
|
build (11)
Process completed with exit code 1.
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
Connection has been closed
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (11)
java.lang.InterruptedException
|
|
build (25)
The strategy configuration was canceled because "build._11" failed
|
|
build (25)
The operation was canceled.
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
Connection has been closed
|
|
build (25)
java.lang.InterruptedException
|
|
build (25)
java.lang.InterruptedException
|
|
slow-tests
Canceling since a higher priority waiting request for PR verify-5647 exists
|
|
slow-tests
The operation was canceled.
|
|
PR verify
Canceling since a higher priority waiting request for PR verify-5647 exists
|
|
integration-tests
Canceling since a higher priority waiting request for PR verify-5647 exists
|
|
integration-tests
The operation was canceled.
|