Skip to content

Dev (#314)

Dev (#314) #609

Triggered via push September 22, 2025 07:59
Status Failure
Total duration 34s
Artifacts

maven.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (8)
Process completed with exit code 1.
test (11)
The operation was canceled.
test (11)
The strategy configuration was canceled because "test._8" failed
test (9)
The operation was canceled.
test (9)
The strategy configuration was canceled because "test._8" failed